You lot need to take an ICE COLD SHOWER

I'll now try to explain the method I used, I must admit that I had a lot of coaching from friend Pete on this which I would like to thank him for.
So making the cones:-
I'll post this in instalments as the method is rather long winded.
First Job is to make some tooling.
D Bits you will need two tapered D bit whilst you set up make a few spares to allow for breakages.
Steam water feed injectors9 deg and 13 deg made from 3/16" dia silver steel (drill rod) to turn the taper you will need a razor sharp tool set perfectly on centre, to set you compound at the exact angle turn up a test length and run a DTI over a set length and not the deflection of the pointer for the 13 deg over a 10mm length the deflection will be 1.132mm
Steam water feed injectors
Steam water feed injectorsWith the compound set gently turn the bar down until you have a sharp point, and give it a polish.
Part it off and centre drill the back and whilst your at it put a groove into it.
Steam water feed injectorsThen on the milling machine using a sharp milling cutter to reduce deflection of the point setion the D bit so that it is 0.003" 0.1mm above the centre line.
Steam water feed injectorsUse the groove to hang the D bit from a bit of wire , this is so you have something to hold onto, heat to cherry red and quench vertically into water, so that it stays straight.
Steam water feed injectorsWhen you make the 9 deg bit with the compound set make the assembly tool for the combination cones, this has to be made as accurately as you can.
Steam water feed injectorsTo get the 0.101"(2.565) run out correct first turn a parallel diameter to this size, then with the compound gently turn the point down until it just runs out at the shoulder this shoule give you the correct size. then accurately turn the 0.431" (10.95mm) length.
You will also need to make a 0.037" (0.94mm) thick washer and a setting ring drilled with a No 38 drill, and some stop sleeves for the D bits
The cones have to be made in the correct sequence as you use one to make the other.
Start first with the combination cones:- turn the dia down to be a push fit into the body and part off two slugs one 0.162" (4.11mm) long the other 0.213" (5.4mm) long.
Steam water feed injectorsThese little slugs are not easy to hold true, I solved this by using soft jaws bored out to a step to grip the slugs
Steam water feed injectorsYou will also have to set depth a stop on the 9 deg D bit using the setting ring.
Steam water feed injectorsStart with the shorter of the two slugs 0.162" check that it is running true, and centre drill and drill through No 56 then its best that use use the D bit floating so with ut held in a carrier and pushing with the tail stop cut the taper , position the d Bit flat side is underneath or on its side if you have it on top the swarf will build up and probably break it.
Steam water feed injectors
Steam water feed injectorsThen using a triangular scraper radius the mouth of the cone.
Steam water feed injectorsRemove the cone from the chuck, now your going to use it along with the washer to cut the next cone
Steam water feed injectorsPut the thicker slug in the chuck checj that its running true centre drill and drill No56 and using the D bit with the first cone and washer to cut the taper to the correct depth, with the triangular scraper radius the mouth of the cone, its important you do this things won't work without it.
Steam water feed injectorsWith the tapers correctly cut in the cones all that required now is to finish off the stepped diameters
Steam water feed injectors
Steam water feed injectorsTo assembly the cones into the body you know use the assembly tool to get them to the correct depth check that you have a gap between the two cones of 0.037" (0.94mm) by using a No 63 drill as a gauge through the over flow chamber. As a belt and brasses action secure with a tiny drop of High temp loctite 640.
Steam water feed injectors Phew
That took some explaining.
Stew