Hi guys, I know this isn`t really a thread for madmodder but since we have had some discussion on the floor blocks on my cnc thread and other threads, I thought I`d put it on.
This tiny 3 sq mt floor has taken me nearly 8 weeks (evening and weekends). Top photos show the reclaimed blocks going down. Bottom left is the floor sanded and then the bottom right is the floor oiled and waxes! Looks better than in the photos and I`m very pleased with it..but a heck of a lot of work!